INDUSTRY NEWS

REC Silicon to ship polysilicon from Moses Lake plant in Q2

2024-05-06

The Moses Lake facility is expected to be fully operational by the end of 2024. Image: REC Silicon

US polysilicon manufacturer REC Silicon expects to ship the first solar-grade polysilicon from its Moses Lake, Washington facility by the end of June.

In a public statement, the company said that it “continues its ramp-up activities by improving, optimising, and increasing the production capacity at the Moses Lake facility”. Full operational production at the site is expected by the end of 2024, with the first shipment expected before the end of Q2.

(The above content is reproduced from pv-tech,By Will Norman)

 

Disclaimer: This website reproduces information from cooperative media, institutions or other websites. The publication of this article for the purpose of transmitting more information,and it does not imply endorsement of its views or confirmation of the authenticity of the content.  All information on this website is for reference only and can’t be used as the basis for transactions or services. If there are any infringement or other issues in the content of this website, please notify it in time, then this website will be promptly modified or deleted. Anyone who logs in to this website in any way, or directly or indirectly uses the information on this website shall be deemed to have voluntarily accepted the binding of this website statement.